Equipment installation
Equipment installation, relocation and commissioning support
Ultra Engineering Services Ltd installs, relocates and integrates production equipment on live sites — safely, precisely and with minimal disruption to production. We are based in King's Lynn, Norfolk, and carry out installations across East Anglia and the UK.




Installation without the disruption
New equipment is an investment in your site's future, but getting it in is often the riskiest part of the project. Lines have to keep running, access is restricted, and other trades and suppliers need coordinating. We plan installations around your production, so the impact on output is kept to a minimum.
That planning covers everything from how equipment will be brought on site and moved into position, to how services will be connected and when existing equipment needs to be isolated. The result is an installation that runs to a clear sequence, agreed with your team in advance.
What our installation service covers
We install equipment we have built ourselves and equipment supplied by others:
- Positioning, levelling and fixing of new production machinery
- Relocation of existing equipment within a site or between sites
- Line changes, extensions and reconfigurations
- Connecting services, including process and service pipework
- Supporting steelwork, platforms, guarding and access structures
- Commissioning support alongside your team and the equipment supplier

Safe working on live sites
Installing on a working site means sharing space with production staff, forklifts, cleaning teams and live plant. Safety is planned in, not added on. Work areas are agreed and controlled, isolations are coordinated with your engineers, and our time-served engineers work to your site rules alongside our own method statements.
In food and beverage environments we also respect hygiene zoning and housekeeping, keeping work areas tidy and leaving the area ready for cleaning and production to resume.
Relocations and line changes
Moving equipment is often more complicated than installing new. Machines need to be safely disconnected, protected, moved and reinstated, sometimes in a new configuration. We plan relocations in detail, including any modifications, supports or new pipework needed in the new position, and work to bring the line back into production as quickly as practical.
Planning an installation with us
The best installations start early. Involving us while equipment is still being specified lets us check access routes, floor conditions, service connections and supporting steelwork before anything arrives on site. That early planning avoids last-minute surprises and helps protect your production schedule.
We then agree a detailed sequence with your team, covering deliveries, lifting and positioning, isolations, connections and commissioning support. On the day, our time-served engineers work to that plan, keep you updated and leave the area clean and ready for production. Afterwards, our planned preventative maintenance service can keep the new equipment running at its best.
One contractor for the whole job
Because we also manufacture machinery, fabricate steelwork and install pipework, one team can handle the mechanical scope of an installation from start to finish. That means a single point of contact, fewer interfaces to manage and clear accountability. After installation, our planned preventative maintenance and 24/7 emergency call-out services keep the equipment running. We work from King's Lynn across Norfolk, East Anglia and the United Kingdom.
FAQ
Frequently asked questions
Do you install equipment supplied by other manufacturers?
Yes. We install equipment we build ourselves and equipment supplied by others, including the supporting steelwork and pipework connections.
Can you install equipment while the rest of the site keeps running?
Yes. We plan installations around your production, agree work areas and isolations in advance, and schedule critical tasks into shutdown windows where needed.
Do you relocate existing machinery?
Yes. We disconnect, move and reinstate equipment within a site or between sites, including any modifications needed for the new position.
Do you help with commissioning?
Yes. We provide commissioning support alongside your team and the equipment supplier to get the line running.
How do you keep installations safe?
Work is planned with method statements, controlled work areas and coordinated isolations, carried out by time-served engineers working to your site rules.
Which areas do you cover?
We are based in King's Lynn and install equipment across Norfolk, East Anglia and the wider United Kingdom.
Planning an installation or relocation?
Share your timescales and shutdown windows and we will plan the work around them.